• 04:01 Border Highway Connector

    Border Highway Connector

    October 16, 2024

    The Border Highway Connector would be a new roadway alignment extending between the existing NM 136 (Pete V. Domenici Blvd) corridor to the existing NM 273 (McNutt Rd). The study is looking at potential corridor alternatives to improve the connection between the Santa Teresa Port of Entry on NM 1...

  • 01:09 Pueblo Alto / Mile Hi Green Stormwater Infrastructure Phase IIIA

    Pueblo Alto / Mile Hi Green Stormwater Infrastructure Phase IIIA

    October 15, 2024

    The Pueblo Alto & Mile Hi Drainage Study Project was created to address flooding issues in Albuquerque neighborhoods. It focuses specifically on drainage problems south of Constitution Avenue to Lomas Boulevard, between San Pedro Drive and Washington Street. We created this visualization to s...

  • 02:27 4th Street Revitalization Roundabout - Albuquerque New Mexico

    4th Street Revitalization Roundabout - Albuquerque New Mexico

    October 15, 2024

    The 4th Street Revitalization project is a collaborative effort between the Village of Los Ranchos and the Bohannan Huston team that seeks to improve the area from Pueblo Solano to north of Ortega Road. The Phase 2 improvements include a more navigable roadway with one lane in each direction, a n...